|
Fouling of plant equipment results in increased cost
of operation. Fouling costs vary depending on the process,
location and manpower. Major costs include:
- Loss of energy (due to heat transfer problems)
- Reduced flow
- Increased pressure
- Loss of throughput (reduced production)
- Increased investment (use switchable exchangers)
- Replacement of equipment
- Frequent change of catalyst bed
- Cleaning and disposing of toxic wastes
- Increases safety hazards (fires)
- Use of costly chemical additives
- Frequent furnace tube decoking
|